As needed
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Procedure
Step 1
Using 100-ohm shielded BITS clock cable pair #22 or #24 AWG (0.51 mm² or 0.64 mm²) twisted-pair T1-type
wires, wrap the alarm wires on the appropriate wire-wrap pins according to local site practice. Ground the
shield of the BITS Input cable at the BITS end. For BITS Output, wrap the ground shield of the BITS cable
to the frame ground pin (FG1) located below the column of BITS pins.
Cisco ONS 15454 Hardware Installation Guide
107
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
DLP-G23 Install Alarm Wires on the Backplane (ANSI Only)
Summary of Contents for ONS 15454
Page 2: ... 2019 Cisco Systems Inc All rights reserved ...
Page 16: ...Cisco ONS 15454 Hardware Installation Guide xvi Contents ...
Page 28: ...Cisco ONS 15454 Hardware Installation Guide xxviii Preface Preface ...
Page 36: ...Cisco ONS 15454 Hardware Installation Guide 6 Overview Cisco ONS 15454 M6 Shelf ...
Page 510: ...Cisco ONS 15454 Hardware Installation Guide 480 Hardware Specifications Dimensions ...