Step 19
Align the screw holes on the left top air deflector with the screw holes on the left side of the chassis.
Step 20
Insert M4 pan-head screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 21
Place the mounting bracket flush in the middle position on the left top air deflector (see Diagram 4 of
Step 22
Align the screw holes on the mounting bracket with the screw holes on the left top air deflector.
Step 23
Insert M4 flat-head screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Figure 210: Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration - Middle
Position
Step 24
Return to your originating procedure. (NTP).
Cisco ONS 15454 Hardware Installation Guide
312
Installing the ONS 15454 M6 Shelf
DLP-G565 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration
Summary of Contents for ONS 15454
Page 2: ... 2019 Cisco Systems Inc All rights reserved ...
Page 16: ...Cisco ONS 15454 Hardware Installation Guide xvi Contents ...
Page 28: ...Cisco ONS 15454 Hardware Installation Guide xxviii Preface Preface ...
Page 36: ...Cisco ONS 15454 Hardware Installation Guide 6 Overview Cisco ONS 15454 M6 Shelf ...
Page 510: ...Cisco ONS 15454 Hardware Installation Guide 480 Hardware Specifications Dimensions ...