1 Operational Manual
N) k : Large injection mode selection. Press
or
to select
“
open
”
or
“
close
”
, and push
to complete the selection.
O) llll.l : Injection leakage position setup. In case injection moves out of set
position under automatic operation mode,
“
060
”
filling volume insufficient or
leakage will show as a warning sign.
P) mmmm.m : Should injection move within set position when injection time is due under
automatic operation mode
“
059 nozzle clog
”
alarm will ring.
Q) nnnnnnnnnnnnnn: Injection mode selection. Press
or
for any option
among four and push
to complete the selection:
Q.a) 1.Closed-loop (optional).
Q.b) 2.Open-loop (standard).
Q.c) 3.Closed-loop and automatic holding pressure (optional).
Q.d) 4.Open-loop and automatic holding pressure (optional).
2.13.3 Sequence Diagram of Holding Pressure
Holding Pressure Stroke 3
2
1
Holding Pressure
Curve
Acceleration/Deceleration Setup
pp.p% oo.o% nn.n%
Time Setup
iii.i fff.f ccc.c
Speed Setup gg dd aa
bb
ee
hh
hh/2
0
Refer
To
Filling
Stroke
04/08/13
63