CDC-2000
操作手冊
Operational Manual
N) iii.i : Mold-closing time display.
O) The descending order of the requirement for mold-closing switch position setup
is : RRR.Rmm ≧ WWWW.Wmm ≧CCCC.Cmm ≧ FFFFFp ≧ IIIIIp.
2.5.4.2. Operational Description for Fast Mold-Closing:
There are three phases for fast mold-closing:
A) Fast mold-closing as the first step to move molds speedily.
B) Low-pressure mold-closing as the 2
nd
step to slowly move and provide protection
for molds. Sine molds are moved and closed at low-pressure and speed the parameter
setting for
“
DD
”
and
“
EE
”
has to be less than 40%, and the less the better.
As this step,
“
VVV.V
”
is used to make sure nothing goes wrong. Should any
situation occur,
“
072
”
, indicating unclean mold, will appear on the screen and
alarm rings.
C) Mold-closing confirmation as the 3
rd
step: as the machinery is oil pressure
directly driven, prior to the stroke of high-pressure mold-closing a
confirmation of molds being installed and matched as to be made. The pressure
will rise after cylinder close the molds. The molds are fully matched and closed
is then confirmed as the pressure rises to the level set by the pressure switch
(Input 11). At this moment, fast cylinder has completed the procedure of mold
closing.
2.5.4.3. Sequence Diagram of Fast-Speed Mold-Closing
Fast-speed distance fast mold-closing low-pressure confirmation
Mold-closing
Special mold-closing distance
Velocity parameter
Pressure parameter
Counter-balance parameter
Special start-position WWWW.W
End-position setup CCC.C FFFFF IIIII
Fast-tank external signal IN11
ZZZ.
AA
BB
ee
XX
YY
ee
DD
EE
ff
GG
HH
gg
AA
BB
ee
Details %
sequence ,
please
refer to
chart (04)
Sequence diagram of
fast-speed tank-type
2.5.4.4. Fast Mold-Opening Setup
Move the cursor to the desired parameter for mold-opening. Key in your desired
digits and press
to complete the correction..
Code descriptions for Menu (03) fast-speed mold-opening are as follows:
04/08/13
30