1 Operational Manual
b) Modify the stroke check time and speed/pressure setting of core in 2 and core out
2.
c) Check the directional control valve of core out 2.
d) Check the core out mechanism.
CORE-PULL SETTING
CORE 1 IN CORE 1 OUT
SPEED % EE II
PRESSURE % FF JJ
MODE AAAAAAAAAA CCCCCCCCCCC
POSITION BBBB.B DDDD.D
TIME SEC GGG.G KKK.K
FEEDBACK HHHHHH LLLLLL
CORE 2 IN CORE 2 OUT
SPEED % QQ UU
PRESSURE % RR VV
MODE MMMMMMMMMM OOOOOOOOOO
POSITION NNNN.N PPPP.P
TIME SEC SSS.S WWW.W
FEEDBACK TTTTTT XXXXXX
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
Menu 06
3.22 “037 Check Limit Switch of Large Cylinder”
(A) The stopping signal of high-pressure mold-closing (Input 12) and feedback
confirmation of high-pressure mold opening (Input 21) are both
“
ON
”
, will appear
the alarm.
(B)Remedy:
a) Please check feedback signal of mold-opening (Input 21) and stopping signal of
mold-closing. (Input 12).
3.23 “038 Moving Distance‘s Error of Large Cylinder”
(A) The operation of high-pressure cylinder of mold opening is not completed within
04/08/13