![CERUS CI-007-P2 Installation, Programming Operation, & Maintenance Manual Download Page 28](http://html1.mh-extra.com/html/cerus/ci-007-p2/ci-007-p2_installation-programming-operation-and-maintenance-manual_2583979028.webp)
Chapter 3 – Installation & Wiring
3.2.4 Digital and Analog control circuits terminals layout
7.5~40HP (5.5 ~ 30kW) 200V/400V/600V Class VFDs
All
CM
terminals are connected together and all
5G
terminals are connected together internally.
50~700HP (37~525kW) 400V and 50~150HP (37~110kW) 600V Class VFDs
Note: All
CM
terminals are connected together and all
5G
terminals are connected together internally.
A0 B0 5G 5G S0 S1
V+ V1 5G V- I NT
C+ CM C- M6 24 M7 M8
M1 CM M2 M3 24 M4 M5
3A 3C 3B A1 C1
A2 C2 A3 C3 A4 C4
C+ CM C- M6 24 M7 M8
M1 CM M2 M3 24 M4 M5
3A 3C 3B A1 C1
A2 C2 A3 C3 A4 C4
CM NC 5G 5G ET S0 S1
V+ V1 CM V- I A0 B0
Summary of Contents for CI-007-P2
Page 23: ......
Page 107: ......
Page 110: ...Chapter 6 Parameter Description 7 4 PID control with Pipe Broken function diagram...
Page 111: ...Chapter 6 Parameter Description 7 4 7 5 PID control with Pre PID function diagram...
Page 112: ...Chapter 6 Parameter Description 7 5 7 6 PID Control Setting Notes...
Page 113: ......