![CapstanAG PinPoint III ENVELOP Operator'S Manual Download Page 3](http://html1.mh-extra.com/html/capstanag/pinpoint-iii-envelop/pinpoint-iii-envelop_operators-manual_2554700003.webp)
TM
Contents
Contents
Signal Words...............................................................................................................................7
Safety Signs................................................................................................................................ 7
Pressurized Fluid Lines.............................................................................................................. 8
Personal Protective Equipment.................................................................................................. 8
Battery Safety..............................................................................................................................8
Chemical Safety.......................................................................................................................... 8
Emergency Safety.......................................................................................................................8
Chapter 2: Warranty.............................................................................. 9
Chapter 3: Introduction.......................................................................11
This Manual...............................................................................................................................11
System Identification................................................................................................................. 11
Virtual Terminal Display............................................................................................................12
Chapter 4: Installation.........................................................................13
Prepare for Installation and Setup............................................................................................13
Tip Selection and Capacities.................................................................................................... 13
Nozzle Types and Component Identification............................................................................ 14
7-Watt—15 Series Coil Assembly Components............................................................ 14
12-Watt—24 Series Coil Assembly Components.......................................................... 15
Move the Spray Tube Mount (Nozzle Valve Interference).............................................17
Install the Flowmeter Harness.................................................................................................. 22
Install the Power Disconnect Breaker Kit (Optional)................................................................ 23
Install the Battery Harness....................................................................................................... 23
Install the Circuit Breaker......................................................................................................... 24
Chapter 5: Initial System Setup......................................................... 25
Factory Reset Procedure.......................................................................................................... 25
Initial Setup of the Configuration Settings................................................................................ 25
VCM (Geometry) Setup Procedure.......................................................................................... 26
Initial Setup of System Settings............................................................................................... 27
©
2021 Capstan Ag Systems, Inc.
iii
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......