![CapstanAG PinPoint III ENVELOP Operator'S Manual Download Page 50](http://html1.mh-extra.com/html/capstanag/pinpoint-iii-envelop/pinpoint-iii-envelop_operators-manual_2554700050.webp)
TM
Operation
Vehicle
Line Title
Line
Number
Description
Measure and record the distance from the hinge point to the rear axle. A positive number
indicates that the boom is ahead of the rear axle. A negative number indicates the hinge
point is behind the rear axle.
Drawbar Pt. Ahead of R. Axle
4
Measure and record the distance from the drawbar to the rear axle. A positive number
indicates that the boom is ahead of the rear axle. A negative number indicates the
drawbar is behind the rear axle.
Implement
Line Title
Line
Number
Description
Boom Ahead Rear Axle
1
Measure and record the distance the boom is from the rear axle. A positive number
indicates that the boom is ahead of the rear axle. A negative number indicates that the
boom is behind the rear axle.
Trail Axle Ahead R. Axle
2
Measure and record the distance the trail axle is from the rear axle. A positive number
indicates that the trail axle is ahead of the rear axle. A negative number indicates that the
trail axle is behind the rear axle.
Trail Hitch Ahead R. Axle
3
Measure and record the distance the trail hitch is from the rear axle. A positive number
indicates that the trail hitch is ahead of the rear axle. A negative number indicates that
the trail hitch is behind the rear axle.
Trail 2 Axle Ahead R. Axle
4
Measure and record the distance the trail 2 axle is from the rear axle. A positive number
indicates that the trail 2 axle is ahead of the rear axle. A negative number indicates that
the trail 2 axle is behind the rear axle.
ISO Look Ahead
Line Title
Line
Number
Description
1
ON Look Ahead Time
©
2021 Capstan Ag Systems, Inc.
50
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......