![CapstanAG PinPoint III ENVELOP Operator'S Manual Download Page 54](http://html1.mh-extra.com/html/capstanag/pinpoint-iii-envelop/pinpoint-iii-envelop_operators-manual_2554700054.webp)
TM
Operation
Configuration
Line Title
Line
Number
Description
Synchro If in External Rate mode, the rate controller controls the pulsing
nozzles and the PinPoint
™
system controls the pump to a target
pressure.
If in Internal Rate or ISO mode, the PinPoint
™
system controls the
pulsing nozzles and the pump.
N-Ject The pulsing nozzles are used for rate control on fertilizer systems.
No Pulse Mode The PinPoint
™
valves are used for on/off functions. Rate is controlled
by pressure.
Valves Off The PinPoint
™
valves are off. Other nozzles are used for application.
Rate is controlled by pressure.
Product Mode
Single One product is applied.
Boost One product is applied with two valves at each location.
3
Dual Two products are applied.
Master Switch Source
None There is no master switch connected to the CapstanAG system.
External The master switch is wired to the hub.
4
On-Screen The master switch is shown on the VT display.
Configuration
Line Title
Line
Number
Description
Boom Switch Source
None There is no boom switch connected to the system. Use this setting for CAN
boom switches.
5
External The boom switches are wired to the Gateway hub.
Aux Input Polarity
6
This setting allows for different polarity switches.
VT Update Rate
7
VT Update rate can be lowered for a virtual terminal (VT) that cannot handle enough data.
Display Smoothing
8
Actual rate and pressure are shown as on target if within 10%.
©
2021 Capstan Ag Systems, Inc.
54
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......