![CapstanAG PinPoint III ENVELOP Operator'S Manual Download Page 26](http://html1.mh-extra.com/html/capstanag/pinpoint-iii-envelop/pinpoint-iii-envelop_operators-manual_2554700026.webp)
TM
Initial System Setup
VCM (Geometry) Setup Procedure
1.
>
>
The hub detects which VCM port each VCM connector is installed into.
Figure 15:
2.
If there are two VCMs on one section, you can change their positions. A Swap VCMs icon will
show at the top of the screen (1).
If you install these VCMs in serial number order, they will automatically populate correctly.
3.
If the orientation on a VCM (2) is incorrect, select Swap Ends (3) to change which end the VCM
(4) is on.
4.
Select
to go to the end of the booms.
5.
Make sure that the number of nozzles (5) is correct for your machine.
©
2021 Capstan Ag Systems, Inc.
26
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......