TM
Installation
Hub Identification
Figure 8:
Item
Name
Description
Green—PWR: Power—On when there is key-switch power
to the hub
Red—HUB: Blinks when the main hub processor is running
(1)
LEDs
Yellow—COM: Blinks when the hub is communicating over
CAN or Ethernet
(2)
SECTION VALVES
The Section Valve ports
(3)
VCM
The VCM ports
(4)
SERVO
The Servo port
(5)
PRESSURE/FLOW
The Pressure/Flow port
(6)
ISO CAN/GPS
The ISO CAN/GPS port
(7)
BOOM SWITCH
The Boom Switch port
(8)
ETHERNET
The Ethernet port is used to connect the hub to the
CapMod
(9)
Ground Lug
Connect the ground wire to this lug
(10)
Power Lug
Connect the power wire to this lug
©
2021 Capstan Ag Systems, Inc.
18
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......