Perform the following operations when the unit is replaced.
4.1
Sensor unit
(1) When sensor unit is replaced
1) Set the IP address. (This operation is not required if the default IP address is used.)
Refer to “Imaging unit IP address setting” in the Tool Software Operation Manual for
Ethernet.
2) Check the version of firmware and PLD code version.
Refer to “(2) Checking the Firmware Version” in “5.2.5 Settings” in “2.5 Installation” of “2.
Installation Manual”.
3) Install the firmware and PLD code as required.
Refer to “(3) Installing Firmware and PLD Code” in “5.2.5 Settings” in “2.5 Installation” of
“2. Installation Manual”.
4) Identify the sensor unit.
Refer to “(6) Identifying the Sensor Units” in “5.2.5 Settings” in “2.5 Installation” of “2.
Installation Manual”.
5) Change total number of exposures. (Basically the counter should be reset to “0” when the
sensor unit is replaced.)
Refer to “(13) Changing the Total Image Count” in “5.2.5 Settings” in “2.5 Installation” of
“2. Installation Manual”.
6) Check the image quality.
Refer to “5.2.6 Image Quality” in “2.5 Installation” of “2. Installation Manual”.
7) Back up the data. (Back up the data to FD as required.)
Refer to “Backing Up when Installing” and “(15) Backing Up Setting Data to FD” in “5.2.5
Settings” in “2.5 Installation” of “2. Installation Manual”.
(2) When PWB-50Di (BG7-2999) is replaced
1) Set the PCB dipswitches.
Refer to “2. Settings” of “4. Repair Guide”.
2) Set the IP address. (This operation is not required if the default IP address is used.)
Refer to “Imaging unit IP address setting” in the Tool Software Operation Manual for
Ethernet.
2) Check the version of firmware and PLD code version.
Refer to “(2) Checking the Firmware Version” in “5.2.5 Settings” in “2.5 Installation” of “2.
Installation Manual”.
3) Install the firmware and PLD code as required.
Refer to “(3) Installing Firmware and PLD Code” in “5.2.5 Settings” in “2.5 Installation” of
“2. Installation Manual”.
Summary of Contents for CXDI-50C
Page 15: ......
Page 23: ...2 Installation Manual 6 3 Power Box assemble package 4 Grid optional ...
Page 35: ...2 Installation Manual 18 When normal imaging When timeout due to RX_REQ not negating ...
Page 63: ...2 Installation Manual 46 Fig 3 Input parameters ...
Page 115: ...2 Installation Manual 98 2 Power Box Unit mm Mass 4 2Kg ...
Page 118: ......
Page 163: ......
Page 167: ...CXDI SYSTEM 1 2 Rev 04 Key No 5 Key No 6 Key No 7 Key No 8 Key No 9 Canon Inc ...
Page 186: ......
Page 188: ......
Page 189: ...Content 1 Gathering Information about Problems 1 2 How to back up and recover the system 3 ...