Mast, 3 Stage
PS
S7.1
7110
F-code
Section
C-code
Version no
T-code
001
OE35
271
Service Manual
1996-10-15
© BT Products
for excessive bearing clearance with platform in
fully lowered position by prying platform to one side
and checking with a 0.030 in. shim. Maximum
clearance must not exceed 0.030 in. Check for
excessive bearing clearance with platform in the
fully raised position by prying platform to one side
and checking with a 0.030 in. shim. Maximum
clearance must not exceed 0.030 in.
9. Lower platform to install lift chain anchor pins, and
electrical cable. When installing lift chains, chains
are to be free of twists and adjusted for equal
tension with adjusting nuts (wheel nuts) and
locknuts (jam nuts) torqued to 200 ft-lb. (271 N•m).
Chains are to be centered on sheave within 1/32
in.
10. Remove hoist from platform and test operation of
unit. Check operation first with no load, then with
capacity rated load.
11. Install and connect battery to truck.
1.2. Shimming the Rails.
In order to shim the mast rails, the platform will have to be
removed.
1. Disconnect battery and remove from unit.
2. The truck will have to be hoisted and blocked a foot
off the floor before work can begin.
3. Attach a hoist to top of platform and raise platform
to loosen lift chains.
4. Remove chain anchor pins, steering wheel chain,
and electrical cable. Hydraulically lift up inner
column enough to remove platform.
Lower platform down and out inner column. Place it
away from truck.
Always make sure unit is on level surface
before work can begin.
WARNING
Return