Index
100
ID: 182463115
Electronic cabinets......................................... 34
Measurements of objects in the technical area...
Measurements of the MRI CryoProbe™........ 35
Measurements of the MRI Parallel Transmit™ ...
minimum space required................................ 34
Minimum space required.......................... 34, 35
MRI CryoProbe™........................................... 34
MRI Parallel Transmit™................................. 34
Technical area..................................................... 30
Technical modifications ......................................... 8
Technical room.................................................... 25
technical room............................................... 13, 14
cable lengths.................................................. 60
Central potential compensation connection
values in the technical room ..................... 56
condensation in the technical room ............... 68
Connection values in the technical room ....... 55
Cooling performance of the space cooling in the
technical room .......................................... 64
Disturbance in the technical room.................. 25
water supply installation in the technical room....
telephone ............................................................ 21
temperature
Maximum temperature drift rate............... 64, 64
Room temperature ......................................... 64
temperature and pressure probe ........................ 68
test preparation ................................................... 21
thermal insulation................................................ 68
time delays.......................................................... 58
time of publication ................................................. 8
TN-S net-work (DIN 57100 Part 300).................. 54
transformers........................................................ 25
transport.............................................................. 73
intermediate storage ...................................... 73
transport metods............................................ 73
Unloading area............................................... 73
transport insurance services ............................... 73
Transport limitations...................................... 76, 78
Maximum horizontal acceleration ............ 76, 78
Maximum tilt angle ................................... 76, 78
Maximum vertical acceleration ................ 76, 78
Transport method and limit value
air pads .......................................................... 76
crane.............................................................. 75
rail.................................................................. 75
Reloading ...................................................... 75
tank steel rollers............................................. 76
trailer.............................................................. 75
Transport method and limits
crane.............................................................. 77
heay duty wheels........................................... 77
rail.................................................................. 77
reloading........................................................ 77
tractors of trucks ............................................ 77
trailer.............................................................. 77
Transporting electronic cabinets ......................... 77
Transport method and limits .......................... 77
truck............................................................... 77
types of cooling system ...................................... 63
underground trains/subways............................... 23
upgrade the system ............................................ 37
ventilation motors................................................ 25
ventilation system ............................................... 12
vibration decouplings .......................................... 29
Warning notices
control area.................................................... 11
Cryogenic liquids ........................................... 11
exposed area ................................................. 11
installation........................................................ 9
planning phase .............................................. 10
Water quality ....................................................... 67
U
V
W
Summary of Contents for BioSpec 117 AVANCE III
Page 1: ...Innovation with Integrity MRI T Site planning BioSpec 117 16 AVANCE III Version 1 7...
Page 6: ...Contents 6 ID 182463115...
Page 33: ...ID 182463115 33 Planning details Stray field Figure 6 3 Stray field...
Page 72: ...72 ID 182463115 Planning details...
Page 82: ...82 ID 182463115 Delivery and transport...
Page 84: ...84 ID 182463115 Moving or dismantling the MR system...
Page 92: ...Figures 92 ID 182463115...
Page 94: ...Tables 94 ID 182463115...
Page 101: ...ID 182463115 107 Lastpage...
Page 102: ...Bruker Corporation info bruker com www bruker com...