8
ID: 182463115
Introduction
1.3
Additional documents
The existing manual supplements the documentation of a BioSpec® system for the sole pur-
pose of planning installation.
The installation of an MRI CryoProbe™ requires additional installation schedules and imple-
mentation of installation requirements. This is described in an independent installation planning
manual for an MRI CryoProbe™ and is provided by a local branch.
1.4
Responsibilities
The responsibility for planning installation and for correctly implementing the installation require-
ments lies with the MR system owner, also if the system owner has outsourced planning servic-
es to external provider. Unless otherwise stipulated in the individual case by the contract of sale,
Bruker can only provide information to the system owner.
The transfer of risk is established in the general business terms and /or in the "Terms and Con-
ditions" of the respective contract of sale and must accordingly be taken into account when the
MR system owner plans the installation.
If there is a delay of receipt on the part of the MR system owner after readiness for shipment
has been sent to Bruker BioSpin MRI, the MRI system owner may be charged for the resulting
additional costs. The regulations on a delay of receipt are established in the General Business
Terms and the "Terms and Conditions" of the respective contract of sale.
1.5
Validity
The current manual represents the technical status of the installation requirements at the time
of publication.
Technical modifications that are established in the general business conditions and in the
“Terms and Conditions” of the contract of sale may require modifications in the installation re-
quirements.
Any instrument configurations shown in this manual are typical examples. However, the final
configuration of the ordered instrument is solely defined by the corresponding contract.
Summary of Contents for BioSpec 117 AVANCE III
Page 1: ...Innovation with Integrity MRI T Site planning BioSpec 117 16 AVANCE III Version 1 7...
Page 6: ...Contents 6 ID 182463115...
Page 33: ...ID 182463115 33 Planning details Stray field Figure 6 3 Stray field...
Page 72: ...72 ID 182463115 Planning details...
Page 82: ...82 ID 182463115 Delivery and transport...
Page 84: ...84 ID 182463115 Moving or dismantling the MR system...
Page 92: ...Figures 92 ID 182463115...
Page 94: ...Tables 94 ID 182463115...
Page 101: ...ID 182463115 107 Lastpage...
Page 102: ...Bruker Corporation info bruker com www bruker com...