ID: 182463115
95
Index
Acoustic .............................................................. 30
sound level..................................................... 30
acoustic absorption ............................................. 30
Air conditioning systems ..................................... 64
outlet openings .............................................. 64
air pressure
Consumption.................................................. 70
Minimum pressure ......................................... 70
Air-conditioning system................................. 63, 63
air-conditioning system
Cooling performance...................................... 64
anchorage for seismic safety .............................. 51
Anesthetic gas extraction.................................... 65
anesthetic gases
extracting ....................................................... 14
extracting anesthetic gases ........................... 14
Assembly of filter plates
directly screwed ............................................. 38
installation frame............................................ 38
Available cable lengths ....................................... 59
bending radius
minimum bending radius................................ 41
Minimum bending radius................................ 59
Biological safety .................................................. 13
building vibrations ......................................... 28, 29
cable trays........................................................... 60
calibrated accelerometer..................................... 28
cars ..................................................................... 23
CCM.................................................................... 40
CE/UL/CSA ......................................................... 54
central laboratory alarm network......................... 14
Central potential compensation connection values in
the technical room
Cable cross-section of the power line ............ 56
Maximum earthing resistance ........................ 56
potential compensation wall rail..................... 56
Checklist ............................................................. 85
Compressed air .................................................. 70
Connection cable for electrical............................ 62
Connection values in the technical room technical
room
Input power in stand-by operation ................. 55
Max. input power in operation ....................... 55
Control area ........................................................ 10
Access ........................................................... 10
control area......................................................... 11
Control cable....................................................... 62
Cooling
cooling performance ...................................... 64
cooling
indirect cooling............................................... 64
cooling system .................................................... 63
Air-conditioning unit ....................................... 63
Cold water supply .......................................... 63
Gas extraction ............................................... 63
General room air ventilation system .............. 63
Crane rails and hanging trolleys ......................... 22
CRP components................................................ 62
CRP compressor ................................................ 62
CRP cooling unit it .............................................. 62
CRP preamplifier ................................................ 62
CRP temperature control unit ............................. 62
cryogen gas lines................................................ 58
Cryogen liquids ................................................... 70
cryogenic gases.................................................. 42
Cryogenic liquids
handling ......................................................... 11
storage........................................................... 11
Transport ....................................................... 11
DC consumers .................................................... 25
DC interference................................................... 25
subways......................................................... 25
decontamination ................................................. 13
A
B
C
D
Summary of Contents for BioSpec 117 AVANCE III
Page 1: ...Innovation with Integrity MRI T Site planning BioSpec 117 16 AVANCE III Version 1 7...
Page 6: ...Contents 6 ID 182463115...
Page 33: ...ID 182463115 33 Planning details Stray field Figure 6 3 Stray field...
Page 72: ...72 ID 182463115 Planning details...
Page 82: ...82 ID 182463115 Delivery and transport...
Page 84: ...84 ID 182463115 Moving or dismantling the MR system...
Page 92: ...Figures 92 ID 182463115...
Page 94: ...Tables 94 ID 182463115...
Page 101: ...ID 182463115 107 Lastpage...
Page 102: ...Bruker Corporation info bruker com www bruker com...