From the context menu of the project, new measurement pages can be created.
From the context menu of a measurement page, the folder can be renamed and
deleted. It also allows the creation of measurement pages.
From the context menu of a measurement page, the page can be renamed and
deleted.
To change between different pages, click on the tabs on the bottom of the Main
Project Area.
Online Measurement | 11
Bosch Motorsport
DDU 8 Manual
93 / 160