72
Step 34: Slide Support Assembly
Part 2
Fig. 34.2
Fig. 34.3
B:
At the end of (2110) Slide Ground dig
one, flat bottom, 8” wide by 6” deep hole as
shown in fig. 34.3. Place (2137) SL Upright
in the hole, making sure that it is plumb.
Notice the angled edge slopes towards
(2110) Slide Ground. (fig. 34.3)
C:
Place (2140) Short Upright beside
(2137) SL Upright on the opposite side of
(2110) Slide Ground making sure that it
is plumb. Notice the angled edge slopes
away from (2110) Slide Ground. (fig. 34.2
and 34.3)
D:
Loosely attach (2140) Short Upright and
(2137) SL Upright to (2110) Slide Ground
with 1 (H12) 1/4 x 3” Hex Bolt (with lock
washer, flat washer and t-nut) per board.
(fig. 34.3)
E:
Refill hole halfway with soil and
compact making sure (2137) SL Upright
stays plumb. Finish filling and compacting.
(fig. 34.3)
F:
Tighten bolts in (2140) Short Upright
and (2137) SL Upright then attach (2110)
Slide Ground to uprights with 1 (S3) #8 x
2-1/2” Wood Screw per board. (fig. 34.3)
WARNING:
Digging can be
dangerous if you do not check first for
underground wiring, cables or gas lines.
2137
6”
2140
2110
Angled edges slope
towards Side Ground
H12
1/4” lock
washer
1/4” flat
washer
1/4”
t-nut
1 x
Short Upright 2 x 3 x 33”
Hardware
Wood Parts
2 x
#8 x 2-1/2” Wood Screw
2 x
1/4 x 3” Hex Bolt
(1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
H12
2140
S15
S15
Summary of Contents for ASHBERRY II F23073C
Page 3: ...3 support solowavedesign com ...
Page 4: ...4 support solowavedesign com ...
Page 5: ...5 support solowavedesign com ...
Page 76: ...76 support solowavedesign com NOTES ...
Page 77: ...77 support solowavedesign com NOTES ...
Page 78: ...78 support solowavedesign com NOTES ...