59
Step 24: Door Wall Assembly
Part 1
A:
Tight to the bottom of (2124) Front Floor and flush to the outside edge of (2153) Post attach (2115)
Chalkwall Top to both (2153) Posts and both (2154) Front Posts with 6 (S7) #12 x 2” Pan Screws, as shown
in fig. 24.1 and 24.2.
Hardware
Wood Parts
6 x
#12 x 2” Pan Screw
S7
1 x
Chalkwall Top 5/4 x 4 x 52”
2115
2124
Fig. 24.2
Fig. 24.1
S7
S7
S7
2115
2153
2154
Tight
Flush
2153
Front Wall
Summary of Contents for ASHBERRY II F23073C
Page 3: ...3 support solowavedesign com ...
Page 4: ...4 support solowavedesign com ...
Page 5: ...5 support solowavedesign com ...
Page 76: ...76 support solowavedesign com NOTES ...
Page 77: ...77 support solowavedesign com NOTES ...
Page 78: ...78 support solowavedesign com NOTES ...