BAFWORKS
®
INSTALLATION GUIDE
67
WWW.BIGASSSOLUTIONS.COM ©2013 DELTA T CORP. ALL RIGHTS RESERVED
BAFWORKS
®
INSTALLATION GUIDE
Using BAFWorks
®
(cont.)
Scheduling light group events
The scheduling feature lets you schedule groups of lights to turn on or off at programmed times.
To schedule a light group event:
1.
On the BAFWorks
®
home screen, touch
Lights
.
2. Locate the light group you want to work with, and then touch the
Detail Page
button for the group. The group details page appears.
3.
Next to Schedule Changes, touch
Edit
. The scheduling page appears (Figure 13).
4.
If necessary, at the bottom of the scheduling page, touch
Add New Event
(Figure 13).
5. Set the day(s) of the week on which the event will occur, the start time for the event, and the event action (
Turn On Lights
or
Turn
Off Lights
) (Figure 13).
6. Touch
Save
under the event’s settings.
7. If necessary, touch
Add New Event
at the bottom of the scheduling page to add more events. Configure the settings as described in
step 5 above.
8. Touch
Save
under each event’s settings.
9. If you want to make changes to an event, touch
Edit
under the event’s settings. Touch
Delete
to delete the event. When you are
finished, touch
Done
at the bottom of the scheduling page.
10.
On the group details page, touch the
On
button next to
Schedule
to enable the scheduled event(s).
11. Touch
Done
at the bottom of the group details page.
12.
Observe the light group icon on the light groups screen. Note that a calendar icon appears in the top right corner of the group icon,
indicating that scheduling is enabled for the group (Figure 14).
Figure 13–Lights scheduling page
Figure 14–Calendar icon on the light group icon
Summary of Contents for BAFWorks 3.0
Page 2: ...Customer Service 1 877 BIG FANS International 1 859 233 1271...
Page 62: ......
Page 80: ......
Page 83: ......
Page 84: ...003915 01 2425 Merchant St Lexington KY 40511 1 877 BIG FANS WWW BIGASSFANS COM REV I...