![BETTCHER INDUSTRIES AirShirz Operating Instructions And Spare Parts List Download Page 61](http://html.mh-extra.com/html/bettcher-industries/airshirz/airshirz_operating-instructions-and-spare-parts-list_2743095061.webp)
OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 55
9.4.7
Servo Linkage Removal (Continued)
Remove the master link from the underside of the middle pin if it has not fallen off on its own.
CAUTION
IF IT IS NOT INTENDED THAT THE FINGER LOOP BE REMOVED AT THIS TIME
,
BE SURE IT IS SEATED FULLY ONTO THE POST AND DO NOT DISTURB IT
.
9.4.8
Servo Linkage Installation
Disconnect the air line.
Wipe clean all links, screw, small washer, and the finger loop post. Inspect all holes and slots for
signs of wear. All pivoting and sliding parts should fit together with little or no side play.
Install one end of the master link to the underside of the middle pin. Install the top plate onto the
top side of the middle pin and loosely install the small screw to hold the master link and top plate
together as shown below.
FIGURE #48
FIGURE #49
Apply Bettcher
®
Max-Z-Lube to the finger loop post.
LARGE SIDE OF HOLE FACES SCREW