![BETTCHER INDUSTRIES AirShirz Operating Instructions And Spare Parts List Download Page 59](http://html.mh-extra.com/html/bettcher-industries/airshirz/airshirz_operating-instructions-and-spare-parts-list_2743095059.webp)
OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 53
9.4.4
Blade Latch Installation
Disconnect the air line.
Clean area around post and re-install latch ring with the projections at the top edge as shown in
Figure #43. Rotate latch ring between the unlocked and locked positions. The tang
s
of the latch
ring should engage the flats on the post to produce a "detent" action in both positions. If this
detent action does not hold the latch ring in the unlocked position, replace the latch ring.
Re-install the cover (refer to Section 9.4.2).
9.4.5
Disconnecting Master Link
Disconnect the air line.
Remove blade set and cover (refer to Section 9.4.1)
Push the rod fully into the power cylinder.
Remove the screw holding the halves of the master link together.
Lift the top plate of the master link off the pivot pins and set aside. Push the end of the master link
attached to the control valve off the rod pin and rotate it forward.
FIGURE #44
FIGURE #45
TOP PLATE
MASTER LINK SCREW
ROD FULLY IN