OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 17
SECTION 7.0
INSTALLATION
The AirShirz
®
requires a supply of clean air in the range of 80 to 120 PSI (5.5 - 8.3 Bars).
The location of the connection to this air supply should be carefully planned to provide a
comfortable routing of the coiled tubing away from the work activities. The connection
should be close enough to allow the operator full freedom of motion within the work space,
yet not so close as to cause the coiled tubing to bunch and tangle. Note that the spent air is
exhausted at the connector-end of the coiled tubing. This discharged air should be directed
away from the operator and away from the product.
If the air supply does not already have a filter and pressure regulator, these items will need
to be installed. If you purchased these items from Bettcher Industries, they will fit onto
size 1/4 NPT pipe threads. The order of installation is very important. The air filter is
installed
upstream
from the regulator and air gage as shown in the following illustrations.
NOTE
:
USE A THREAD SEALING COMPOUND WHEN
MAKING PIPE CONNECTIONS
.
The AirShirz
®
filter/coupler attaches to the outlet end of the air supply line and can be
installed in either of two configurations:
7.1
Configuration #1 - Permanent Mount To End of Air Supply Pipe
Use a 3/4 inch open end wrench to hold the filter body while using a 9/16 inch wrench to
unscrew the standard male quick connector.
EXHAUST
AIRSHIRZ®
FILTER/COUPLER
1/4 NPT PIPE
THREADS
4”
PRESSURE
REGULATOR
AIR
FILTER
REPLACEMENT
ELEMENT
AIR
SUPPLY
CONFIGURATION #1