![BETTCHER INDUSTRIES AirShirz Operating Instructions And Spare Parts List Download Page 44](http://html.mh-extra.com/html/bettcher-industries/airshirz/airshirz_operating-instructions-and-spare-parts-list_2743095044.webp)
OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 38
9.1.3.1
Greasing the Drive Roller and Servo Link (Continued)
•
Hold the grease gun directly over the grease fitting, and push the cone tip of the gun tightly
against the fitting
•
Pump the plunger on the grease gun until grease is seen coming out at the ends of the roller.
Wipe off excess grease. Push the roller upward, then push the rod to the fully out, end of
stroke, position.
•
Hold the grease gun in the hole in the white servo link (see Figure #26B) and push the cone
tip of the gun tightly against the link.
•
Pump the plunger on the grease gun until grease is seen coming out from the back side of
the servo link.
•
Close the linkage cover
•
Install the blade set
FIGURE #26A
NOTE:
To load the grease gun, thread a new tube
of
Bettcher
®
Max-Z-Lube
into the side of
the grease gun. Squeeze the tube to
remove air while pumping the
plunger until grease comes
out the tip in a steady stream.
Do Not Remove the Tube of Grease from
the Gun Once it is Installed, Until the Tube
is Empty.
FIGURE #26B
Rod Pushed Fully In
Grease Coming Out
Post Screw
Master Link