![BETTCHER INDUSTRIES AirShirz Operating Instructions And Spare Parts List Download Page 27](http://html.mh-extra.com/html/bettcher-industries/airshirz/airshirz_operating-instructions-and-spare-parts-list_2743095027.webp)
OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 21
8.1.1
Blade Installation Sequence (Continued)
•
Confirm that the roller is at the top of the pocket. If not, it can be moved by pushing
forward on the linkage at the power cylinder rod. (See Figure #10).
FIGURE #10
•
Check that the blade set mechanism and mounting area are clean.
•
Hold the blade set by the closed blades with a gloved hand. The fixed blade should be
facing you and the movable blade will be behind it.
•
Hold the power unit in your other hand so the blade pocket is facing you.
•
Align the holes in the fixed blade with the pins on the power unit, as shown.
FIGURE #11
PUSH LINK
Roller
CLEAN