![BETTCHER INDUSTRIES AirShirz Operating Instructions And Spare Parts List Download Page 60](http://html.mh-extra.com/html/bettcher-industries/airshirz/airshirz_operating-instructions-and-spare-parts-list_2743095060.webp)
OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 54
9.4.6
Connecting Master Link
Disconnect the air line.
If needed, pull the control valve rod outward slightly. Rotate the finger loop until the free end of
the master link engages the pin on the control valve rod.
Install the top plate over both pins, with the large side of the middle hole facing up. Install the
screw loosely. Verify that both ends of the master link and top plate are fully seated on the pins.
Tighten the screw.
9.4.7
Servo Linkage Removal
Disconnect the air line.
Remove the cover. (Reference Section 9.4.1)
Disconnect the master link. (Reference Section 9.4.5).
Push the power cylinder rod fully inward and hold the finger loop against the power cylinder to
allow access to the post screw. Remove the post screw and small washer beneath it.
Note the engagement of the blade link slot with drive link pin.
Grasp the servo linkage from beneath and by the link attached to the finger loop post. Lift the
linkage assembly along with the master link off the pins and post.
FIGURE #46
FIGURE #47
POST SCREW