![BERGHOF B-PRIMIS DC-PRIME DC2110W X CM User Handbook Manual Download Page 22](http://html.mh-extra.com/html/berghof/b-primis-dc-prime-dc2110w-x-cm/b-primis-dc-prime-dc2110w-x-cm_user-handbook-manual_2737010022.webp)
USER HANDBOOK 1.2 | B-PRIMIS DC/ET PRIME 2110W X C, 2115WUX C
Berghof Automation GmbH | Harretstraße 1 | 72800 Eningen |
www.berghof-automation.com
270011X00_B-PRIMIS_ET-DC-PRIME 2110W-2115W_EN.docx
22
4.2. Preparation for installation from the front
DC/ET2110W X C
The device is intended for installation from the front into a rectangular cut-out on a panel. The support
material must be rigid and be from 1 to 3 mm thick.
Fig. 7: Dimensions DC2110W X CM / ET2110W X CS
Requirements:
To allow sufficient air circulation, it must be ensured that the device has a clear space of at least
20 mm all round at the rear.
The max. ambient temperature inside the control cabinet must not exceed 55 °C in operation.
The support material for the installation cut-out must be flat, sufficiently stable, and be from 1 to 3
mm thick.
NOTE
Damage to the device!
Installation on uneven support material can lead to mechanical stresses and cracks in the front face or
malfunctioning of the touch screen.
Make sure that the mounting points of the device are all in a common plane, with no more than max-
imum ±0.5 mm variation.