After completing the installation, check the items in the following table to make sure that the
inverter has been safely and correctly installed.
Items
Check Point
Ref.
Result
Installation Location/Power
I/O Verification
Is the installation location appropriate?
p.4
Does the environment meet the
inverter’s operating conditions?
p.5
Does the power source match the
inverter’s rated input?
p.351
Is the inverter’s rated output sufficient
to supply the equipment?
(Degraded performance will result in
certain circumstances. Refer to 11.7
Continuous Rated Current D
for details.
p.351
Power Terminal Wiring
Is a circuit breaker installed on the
input side of the inverter?
p.12
Is the circuit breaker correctly rated?
p.351
Are the power source cables correctly
connected to the R/S/T terminals of
the inverter?
(Caution: connecting the power source
to the U/V/W terminals will damage
the inverter.)
p.22
Are the motor output cables
connected in the correct phase
rotation (U/V/W)?
(Caution: motors will rotate in reverse
direction if three phase cables are not
wired in the correct rotation.)
p.22
Are the cables used in the power
terminal connections correctly rated?
p.9
Is the inverter grounded correctly?
p.21
Are the power terminal screws and
the ground terminal screws
tightened to their specified torques?
p. 22
Are the overload protection circuits
installed correctly on the motors (if
multiple motors are run using one
inverter)?
-
Is the inverter separated from the
power source by a magnetic
contactor (if a braking resistor is in
p.12
Summary of Contents for Rsi S Series
Page 2: ......
Page 6: ......
Page 12: ...Preparing the Installation 0...
Page 22: ...Preparing the Installation 10...
Page 70: ...LearningAdvanced Features 58...
Page 152: ...LearningAdvanced Features 140 PID controlblock diagram...
Page 224: ...LearningAdvanced Features 212...
Page 356: ...344...
Page 362: ...Maintenance 350...
Page 381: ...369 TechnicalSpecification...
Page 397: ......