CHK
ADJ
- 47 -
Position
Description
Quantity
20
ROCKER ARM
2
21
CABLE GLAND
1
22
TUBE GUIDE
3
23
CLUTCH CONTROL LEVER
1
24
RUBBER CLAMP
2
25
SCREW
2
26
NUT M6
1
27
SPECIAL NUT
1
28
SPECIAL SCREW
1
29
CLUTCH SWITCH
1
30
SCREW
1
31
SCREW M6X14
2
32
U-BOLT
1
33
LEVER SUPPORT
1
ENGINE/ACCELERATOR CABLE CLEARANCE
ACCELERATOR CABLE CLEARANCE ADJUSTMENT
NOTE:
Before adjusting accelerator cable clearance, it is necessary to
set the minimum idle speed of the engine.
First check at 1000 km (621 mi) and then every 6,000 km (3.726
mi).
Check:
•
accelerator cable clearance (A)
Make sure that the accelerator control grip (2) is working normal-
ly and that it is possible to reach the maximum open position and
automatic closure position in all steering positions. If necessary,
adjust. Fig.A
Accelerator cable clear-
ance (A)
Size
Accelerator cable
3 - 5 mm
Adjust:
•
accelerator cable clearance
Handlebar side
1. Loosen the nut support "D"
2. Turn the adjustment nut "C" clockwise or anticlockwise to
set the accelerator cable clearance as specifi ed. Fig.B
Accelerator cable clear-
ance
Clearance
Clockwise
Increases clearance
Anticlockwise
Reduces clearance
3. Tighten the support nut "D"
Make the adjustment to both acceleration controls.
IMPORTANT NOTICE:
After adjusting the clearance of the accelerator, start the engine
and turn the handlebars to the right and left, making sure that
the minimum idle speed of the engine does not change.
A
A
B
B
C
D
Summary of Contents for 2014 BN600
Page 1: ...SERVICE STATION MANUAL code Pure Passion since 1911 ...
Page 6: ...GEN INFO 5 GEN INFO General Information CHAPTER 1 ...
Page 19: ...SPEC 18 SPEC Specifications CHAPTER 2 ...
Page 37: ...CHK ADJ 36 CHK ADJ Inspections and Periodic Adjustments CHAPTER 3 ...
Page 40: ...CHK ADJ 39 NOTES ...
Page 80: ...CHAS 79 Frame CHAPTER 4 CHAS ...
Page 175: ... 174 ENG ENG Engine CHAPTER 5 ...