- 229 -
ENG
Position
Description
Quantity
19
MINIMUM AIR PIPE 2
1
20
MINIMUM AIR PIPE 1
1
21
SCREW (M5×25)
2
22
BUSHING
2
23
VIBRATION DAMPING RUBBER
2
24
SPECIAL PLATE
1
25
WASHER
2
SUPPLY
THROTTLE VALVE REMOVAL
Removal:
1. Remove the 4 suction pipes (19*) and the relevant gaskets
(18*), loosening the 8 screws (21*) Fig.A.
2. Loosen the screw clip (22*) and take out the throttle valve
(11) Fig.B.
Check:
•
Suction pipes (19*)
If there are any anomalies/traces of wear, replace
•
the relevant gaskets (18*).
If there are any anomalies/traces of wear, replace
NOTE
The numbers marked (*) are part of the replacement parts table
in the chapter “Head timing belt” chapter, “valve fl ap and calibra-
ted pad removal” section.
Adjustment
NOTE
Make this adjustment with the engine running.
Connect:
•
The tubes of the vacuum gauge to the 4 fi ttings (A) Fig. C
Start:
•
The engine to get it to a temperature of about 90°/95° C.
Check:
•
Alignment of the mercury column with the engine running at
minimum.
Proceed to balance, if necessary.
NOTE
Make sure the bypass screws (B) on valves 1-2-3-4 are comple-
tely closed Fig.C.
A
B
19*
22*
11
21*
C
A
1
2
3
4
B
B
Summary of Contents for 2014 BN600
Page 1: ...SERVICE STATION MANUAL code Pure Passion since 1911 ...
Page 6: ...GEN INFO 5 GEN INFO General Information CHAPTER 1 ...
Page 19: ...SPEC 18 SPEC Specifications CHAPTER 2 ...
Page 37: ...CHK ADJ 36 CHK ADJ Inspections and Periodic Adjustments CHAPTER 3 ...
Page 40: ...CHK ADJ 39 NOTES ...
Page 80: ...CHAS 79 Frame CHAPTER 4 CHAS ...
Page 175: ... 174 ENG ENG Engine CHAPTER 5 ...