- 204 -
ENG
•
Assemble the half casings on the bottom crank case, pre-
viously fi xed to the support and turned 180° Fig.D.
•
Insert the 4 fastening screws for the two half casings (25-
23-27-28) and proceed with the following torque:
T.R.
Torque 120~130
N*m
Measure:
•
Use the specifi c measuring tool with an inner contact dia-
gram of the four housings of the main bearings Fig. E
Internal diameter (A)
Size
Coupling housing 1 (A1)
31.99~32.009 mm
Coupling housing 2 (A2)
31.99~32.009 mm
Coupling housing 3 (A3)
31.99~32.009 mm
Coupling housing 4 (A4)
31.99~32.009 mm
•
Once the bottom half casing is removed, proceed to lubri-
cate the main half bearings (6) of the top half casing, using
copper grease Fig. F
NOTE
While fi tting the drive shaft, the pistons must be pre-assembled.
Also lubricate the connecting rod half bearings (8) Fig. F.
CRANK GEAR
MAIN HALF BEARING AND DRIVE SHAFT INSTALLATION
D
E
A1
A2
A3
A4
F
6
8
Summary of Contents for 2014 BN600
Page 1: ...SERVICE STATION MANUAL code Pure Passion since 1911 ...
Page 6: ...GEN INFO 5 GEN INFO General Information CHAPTER 1 ...
Page 19: ...SPEC 18 SPEC Specifications CHAPTER 2 ...
Page 37: ...CHK ADJ 36 CHK ADJ Inspections and Periodic Adjustments CHAPTER 3 ...
Page 40: ...CHK ADJ 39 NOTES ...
Page 80: ...CHAS 79 Frame CHAPTER 4 CHAS ...
Page 175: ... 174 ENG ENG Engine CHAPTER 5 ...