2022.3-0000010 OM
320
trained, studying dosing pump design and service and dosing pump assembly-disassembly
manuals, and provided they have all required service tools, accessories and special hydraulic
stand, ensuring adjustment and check of dosing pump parameters and operability after the re-
pairs have been made. Otherwise a person performing dosing pump assembly and disassem-
bly, replacement of parts and components or adjustment of valves, as well as tractor owner,
bears full responsibility for dosing pump nonoperability.
7.13 Possible failures in the electronic control system of RLL and guidelines
for troubleshooting
Cables and control system of RLL connecting diagrams is shown in Figures
7.13.1, 7.13.2. Rules of failure diagnostics of the RLL ECS are specified in clause
2.15.4 “Troubleshooting of RLL electronic control system” of subsection 2.15 “Lift link-
age controls”. Possible RLL electronic control system errors codes and guidelines for trou-
bleshooting are shown in Table 7.13.
ATTENTION: DISCONNECTION OF THE ELECTRIC SOCKETS OF THE REAR
LIFT LINKAGE ELECTRONIC CONTROL SYSTEM SHALL BE CARRIED OUT WHEN
THE ENGINE IS NOT RUNNING ONLY!
ATTENTION: ALTERATIONS OF THE SPECIFIED VOLTAGE VALUES SHALL BE
DONE WITH THE ENGINE RUNNING, WITH DUE ATTENTION TO THE SAFETY
MEASURES IF OPERATING WITH ELECTRIC UNITS ON LOAD!
ATTENTION: TERMINALS IN THE CABLE SOCKETS ARE NUMBERED ON THE
SOCKETS SHELLS!
ATTENTION: REPAIR OPERATIONS OF THE REAR LIFT LINKAGE AND FRONT
LIFT LINKAGE ELECTRONIC CONTROL SYSTEM SHALL BE CARRIED OUT ONLY BY
DEALERS. OTHERWISE THE WARRANTY FOR THE REAR LIFT LINKAGE AND
FRONT LIFT LINKAGE CONTROL SYSTEM BECOMES INVALID!
https://tractormanualz.com/