3-8
3.3 Starting Operation
3.3.1 Pre-operation confirmation
■
Confirmation procedures
The configuration data confirmation procedure is shown below.
Check the following before starting operation.
•
The device is installed appropriately, and there is no damage or breakage to the
feedback lever, feedback pin, etc.
•
The air supply system has been completed and the appropriate supply air pressure
is being supplied (there are no air leaks).
•
The input signal (4 to 20 mA DC) is being applied.
(1) Operation confirmation procedure
The operation confirmation procedure for this device is shown below.
Step
Procedure
1
Vary the input signal from the controller (constant-current supply) and confirm that the
position of the control valve changes according to the set characteristics. If the system
does not operate correctly, see “Troubleshooting.”
2
After confirming proper operation, restore the electrical wiring to its original state and
tighten the terminal box cover firmly.
Summary of Contents for AVP200
Page 30: ......
Page 66: ...2 28...
Page 80: ...4 4 Menu Tree...
Page 120: ...5 16...
Page 128: ...6 8 For models those date of manufacture are before September 2017...
Page 130: ...6 10 For models those date of manufacture are before September 2017...
Page 132: ...6 12 For models those date of manufacture are before September 2017...
Page 136: ...6 16 For models those date of manufacture are after October 2017...
Page 138: ...6 18 For models those date of manufacture are after October 2017...
Page 184: ...Appendix A Specifications A 25...
Page 185: ......
Page 188: ......
Page 190: ......