31
6 PREVENTIVE
MAINTENANCE
6.1 Periodic
maintenance
Periodic maintenance and system testing must be performed to
ensure safety and the machine’s proper operation.
The amount of maintenance required depends largely on the
quality of the incoming water and how often the machine is used.
The maintenance interval will have to be determined in each
individual case. Arjo recommends that the stated maintenance
operations be performed at intervals according to the service table.
6.1.1 Consumables
The following consumables are necessary for preventive
maintenance and are not covered by product warranty. For article
numbers, see the spare parts list.
Consumables
Maintenance area
O-Ring
Steam generator (4)
Sealing
Steam generator (4)
Descaler
Steam generator (4)
Hose in dosing pump
Dosing system (6)
Transport hose 5x8
Dosing system (6)
+(3$¿OWHU
Ventilator (8)
Straps
Ventilator (8)