34
6.2 General (Item 1)
6.2.1 Checking electrical cables and connection points (1.1)
The purpose of checking the cabling and connection points is
primarily to avoid personal injury as well as damage to the machine
itself.
1.
Check that the power cord to the electrical unit is intact, free
of errors and installed as per the instructions.
2.
Check that all cables are connected to the terminal block for
the technical unit.
3.
Check fuses.
F01-13 A C 230 V
Fuses on the machine except the steam generator
4. Check the connection points for the pump.
5. Check the connections on the steam generator.
6.
Check that there are no non-insulated unconnected cables by
the technical unit.
7.
Check to ensure that connections on power cables are
tightened.