NXD-700i - Installation
11
NXD-700i & NXT-CA7 7” Modero Touch Panels
4.
Thread the RJ-45 Ethernet wiring through the knockouts.
Use of the left wiring knockouts are recommended with this installation.
Leave enough slack in the wiring to accommodate any re-positioning of the panel.
5.
Install the drywall/sheetrock before inserting the main NXD unit into the CB-TP7.
Installing the NXD-700i Touch Panel
The NXD-700i can be installed either directly into the (optional) CB-TP7 or other solid surface environment
using the two different mounting options: drywall clips or solid surface screws.
The following sections describe mounting the touch panel directly into a pre-wall conduit box, a solid surface
or drywall, and optional NXA-RK7 Rack Mount Kit.
Installing the Panel Within a Conduit Box
The conduit box must be mounted prior to continuing this section. Refer to the procedures in the
Pre-Wall Installation of the Conduit Box
section on page 10 for detailed pre-wall installation instructions.
Verify that all necessary cables have been threaded through the knockouts on the left of the conduit box and the
connections have been tested prior to installation of the NXD-700i.
1.
Remove the Faceplate/bezel (
A
in
FIG. 11) from the main NXD unit (
B
in
FIG. 11) by gripping the
faceplate and pulling with gentle outward force.
2.
Verify the incoming Ethernet, and USB cables have been properly threaded through the wiring knockouts
on the left of the conduit box.
Leave enough slack in the wiring to accommodate any re-positioning of the panel.
3.
Connect the Ethernet, and USB cables to their corresponding locations along the side of the panel.
4.
Test the incoming wiring by connecting the panel connections to their terminal locations and applying
power. Verify that the panel is receiving power and functioning properly to prevent repetition of the
installation.
FIG. 11
NXD-700i panel installation into a CB-TP7 (pre-wall construction)
B
- Main NXD unit consists of
C
- Optional CB-TP7
#4-40 Mounting Screws
(four - included)
secure the NXD to
Stud
the touch panel and back box housing
conduit/wallbox
A -
Faceplate/Trim Ring
default Faceplate comes with buttons
the Conduit Box
Mounting Tab
Don’t disconnect the connectors from the touch panel. The unit must be installed with
the attached connectors before being inserted into the conduit box.
Summary of Contents for NXD-700i
Page 4: ......
Page 12: ...viii NXD 700i NXT CA7 7 Modero Touch Panels Table of Contents...
Page 30: ...NXT CA7 Installation 18 NXD 700i NXT CA7 7 Modero Touch Panels FIG 19 RJ 45 wiring diagram...
Page 52: ...Configuring Communication 40 NXD 700i NXT CA7 7 Modero Touch Panels...
Page 138: ...Programming 126 NXD 700i NXT CA7 7 Modero Touch Panels...
Page 148: ...Appendix A Text Formatting Codes 136 NXD 700i NXT CA7 7 Modero Touch Panels...
Page 151: ...Appendix B Complex Script Support 139 NXD 700i NXT CA7 7 Modero Touch Panels...