
Chapter 3: Getting Around AltiWare Administrator
AltiWare ACC 5.2 Administration Manual 35
•
Unstaff
—the number of agents who are logged out from the system and have
become a virtual extension
•
Queue
—the number of calls waiting in queue
•
Waiting Time
—the longest wait time of callers in queue
•
Service Level
— the percentage of calls in queue with queue time less than or equal
to the defined service level threshold
Current Resource Statistics Window
The
Current Resource Statistics
window displays the total VoIP channels, available
channels, and in-use channels.
The window allows administrators to monitor VoIP channel usage and MeetMe
conference resource use.
Figure 8. Current Resource Statistics window
Top part of the window
Contains a summary of codec usage. The first
G711 only codec
section is displaying
30-port G711 VoIP board codec use.
Middle part of the window
Displays the following data:
•
Gateway ID
—the ID of the VoIP channel’s home gateway
•
IP Resource
—the Triton VoIP
logical board ID:internal DSP channel ID
•
Codecs Capability
—the codecs the IP channel can use
•
Active Codec
—the codec currently being used
•
Used By
—the extension, trunk, SIP channel or H.323 channel that is using this
channel
•
Connect To
—the extension, trunk, or channel the channel is connected to
•
Packets Sent/Received
—the number of voice packets sent and received
•
Bytes Sent/Received
—the total size (in bytes) of all voice packets sent and
received
•
Network Packet Loss
—the number of voice packets that have been lost due to
prolonged delays, network congestion, or routing failure
•
JB Packet Loss
—the number of voice packets that have been discarded due to jitter
buffer overflow
Summary of Contents for AltiWare ACC 5.2
Page 1: ...AltiWare ACC 5 2 Administration Manual 10 2008 4413 0001 5 2 ...
Page 14: ...2 AltiWare ACC 5 2 Administration Manual ...
Page 38: ...Chapter 2 AltiWare Requirements 26 AltiWare ACC 5 2 Administration Manual ...
Page 50: ...Chapter 3 Getting Around AltiWare Administrator 38 AltiWare ACC 5 2 Administration Manual ...
Page 86: ...AltiGateway Configuration Tool 74 AltiWare ACC 5 2 Administration Manual ...
Page 92: ...Chapter 6 Voice Mail Configuration 80 AltiWare ACC 5 2 Administration Manual ...
Page 102: ...Chapter 7 Auto Attendant Configuration 90 AltiWare ACC 5 2 Administration Manual ...
Page 118: ...Chapter 9 Call Recording Configuration 106 AltiWare ACC 5 2 Administration Manual ...
Page 122: ...Chapter 10 Application Extension Configuration 110 AltiWare ACC 5 2 Administration Manual ...
Page 146: ...Chapter 11 Board Configuration 134 AltiWare ACC 5 2 Administration Manual ...
Page 174: ...Chapter 12 Trunk Configuration 162 AltiWare ACC 5 2 Administration Manual ...
Page 180: ...Chapter 13 In Call Routing Configuration 168 AltiWare ACC 5 2 Administration Manual ...
Page 192: ...Chapter 14 Out Call Routing Configuration 180 AltiWare ACC 5 2 Administration Manual ...
Page 224: ...Chapter 15 Extension Configuration 212 AltiWare ACC 5 2 Administration Manual ...
Page 232: ...Chapter 16 Setting Up IP Extensions 220 AltiWare ACC 5 2 Administration Manual ...
Page 248: ...Chapter 18 Mobile Extension Configuration 236 AltiWare ACC 5 2 Administration Manual ...
Page 266: ...Chapter 20 Paging Group Configuration 254 AltiWare ACC 5 2 Administration Manual ...
Page 270: ...Chapter 21 Line Park Configuration 258 AltiWare ACC 5 2 Administration Manual ...
Page 292: ...Chapter 22 Workgroup Configuration 280 AltiWare ACC 5 2 Administration Manual ...
Page 346: ...Chapter 26 System Report Management 334 AltiWare ACC 5 2 Administration Manual ...
Page 386: ...374 AltiWare ACC 5 2 Administration Manual ...