SAFETY SHEET
CHEMICALS
CAUSE OR ORIGIN OF HAZARD
.
Generally speaking, the products used for installation and commissioning are bought chemical
products, namely :
- Hydraulic oil
- G rea se
- Loctite
- Touc hing-up pa int
- Isop rop anol
- Drying agents
These must be kept in their original packing and the tops replac ed after use.
Some pa cking produc ts require careful handling as they may c ontain preservatives.
WORK REQUIREMENTS.
As a general rule, chemical products must be used and stored away from any source of heat.
Smoking is to be avoided.
Avoid contact with the skin and any splashes to the eyes.
Take the basic hea lth and safety prec autions.
Products and packing must be d estroyed in ac cordanc e with loc al environmental regulations.
SAFETY INSTRUCTIONS
.
OBSERVE ALL GENERAL INSTRUC TIONS G OVERNING INSTALLATION, C OMMISSIONING AND
OPERATION IN AC C ORDANC E WITH CURRENTLY AC C EPTED PRAC TICES AS WELL AS THOSE LAID
DO WN IN THE DOC UMENTATION SUPPLIED WITH THE EQUIPMENT.
Other products
: SF
6
(see relevant sheet)
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...