Installation
Connection with preparation of electrical contact surfaces
G31--501EN04
5/8
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Preparation before assemblage of aluminium alloy and aluminium alloy without
coating
Parts concerned
Envelope and cover FKG1F--X
Process
The table below gives the steps of preparing the contact surfaces :
NOTE
:
The operations below must be realized ONLY at the
moment of the installation.
Step
Action
Diagram
1
dry rub with fine emery
cloth,
A
B
C
A
A
B
C
C
D
A
A
D
C
B
B
FKG1N
FKG1F --X
E
E
E
2
clean thoroughly to elim-
inate dust produced,
3
lightly coat with electri-
cal contact grease,
4
rub over the grease with
A
400
water-proof
emery paper.
Continued on next page.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...