Installation
Filling with SF
6
gas
M32--001EN06
6/10
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Checking pressure
Principle
Having allowed the temperature to remain steady for at least 12 hours after
filling, it is necessary to check and definitively adjust the pressure to its cor-
rected value -- defined according to both ambient temperature and atmo-
spheric pressure.
Preparation
The table below gives the preparation steps before checking pressure :
Step
Action
Diagram
1
D
Remove the plug (17) and
install the filling tool (2).
D
Unscrew the valve--cap (3).
3
17
2
2
D
Connect the tube (15) -- of
the gauge 0--1 MPa (14) -- to
the filling tool (2).
15
14
2
Continued on next page.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...