Installation
Assembly of the circuit breaker on--site
G31--201EN12
9/20
04--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Control insulation
Process
Before continuing erection checking beetwen enclosure/fram insulation for
the 3 poles.
POLE EN-
CLOSURE
POLE
FRAME
FOR THE 3 POLES CHECK
ENCLOSURE/FRAME INSULATION
R
INSULATING
BRACE
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...