Commissioning
Pre--commissioning inspections
G34--001EN04
4/8
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Test operations of circuit--breaker
Test operations
D
The connection of auxiliary circuits is sufficiently advanced to allow remote
controls to be used.
D
Perform 10 CLOSING -- OPENING cycles electrically, by remote control.
Measurements
specific to the
circuit--breaker
D
Closing time
Measure the closing time of each pole from current emission in the circuit--
breaker’sclosingelectro-magnet until the moment when contacts touch in the
pole.
D
Opening time
Measure the opening time of each pole, from current emission in the circuit--
breaker’s opening electro-magnet to the moment when contacts separate in
the pole.
D
Opening-closing sequence times :
Perform a CO cycle and measure the following times :
-- Closing time.
-- Opening time.
-- Closing-opening time.
D
Operating of auxiliary contacts (CS) :
-- Closing operation : Measure operating times of auxiliary contacts. For both
types of contact (a and b).
-- Opening operation : Measure operating times of auxiliary contacts. For
both types of contact (a and b).
D
Simultaneity gap between poles :
Measure the simultaneity gap between poles during the following operations
-- Closing.
-- Opening (circuit 1).
-- Opening (circuit 2).
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...