Installation
Checking for presence of SF
6
gas in poles
G31--061EN04
3/4
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Checking for presence of SF
6
gas in poles
Process
Thetablebelow gives the steps of checking for presence of SF
6
gas inpoles :
Step
Action
Diagram
1
Remove the plug (1) and install
thefilling tool (3), tighten thefill-
ing tool
BY HAND
.
3
1
2
D
Remove the plug (4).
D
Connect the tube (5) -- of the
gauge 0--1 MPa (6) -- to the fil-
ling tool (3).
** If, as foreseen, presence of
gas has been verified carry on
with assembly.
** If, unlikely as this is, there
is a no gas pressure contact
our customer service.
4
5
6
3
3
D
Replace the valve--cap (4)
and remove the filling tool (3).
D
Re--install the plug (1).
3
4
4 daN.m
1
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...