Maintenance
Disassembly and assembly of the GCB equipments
G51--500EN01
8/10
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Remove of the current transformer,
Process
To mark and disconnect the electrical supply of the CT terminal
(H1)
Remove
(bolts H2)
the connecting braids side CB if necessary (see
VS...GAD01D).
Mark the location and remove the CT if necessary
(bolts H3)
.
.
H
.
H2
.
H2
SCREWS
SUPPLY FOLLOWING CUSTOMER
COMMAND(ORDER)
x4
H M16--35
.
H3
.
H1
.
H3
Continued on next page.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...