GRID
High Voltage Switchgear
PS 0002EN
03
1996-03-18
2011-03-21
3 / 3
Sheet N°
Revision
1st issue
Revision date
Page
SAFETY INSTRUCTIONS
P
A
C
K
I
N
G
T
R
A
N
S
P
O
R
T
I
N
S
T
A
L
L
A
T
I
O
N
S
T
A
R
T
-
U
P
O
P
E
R
A
T
I
O
N
M
A
I
N
T
E
N
A
N
C
E
S
C
R
A
P
P
I
N
G
&
R
E
C
Y
C
L
I
N
G
Handling of insulating jac kets at transpo rt pressure (300
hPa maximum).
X
X
X
Ensure that cases have not been damaged during
hand ling or prolonged storag e.
X
Follow the stac king instructions.
X
X
X
It is essential to open cases from the top and to take
care when unpac king.
X
Before
handling
any
hydraulically
operated
component, bring oil pressure back to atmospheric
pressure.
X
X
Before
handling
any
mechanically
operated
component, disable the springs.
X
X
Bring insulating jac ket working pressure ba ck to
transport pressure (300 hPa maximum).
X
X
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...