Installation
Assembly of the circuit breaker on--site
G31--201EN12
12/20
04--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Installing the circuit --breaker -- Step 3
Connections
Carry out the joining up of the flexible connections as follows :
(See VS...GAD01D, ...31--501 and ...31--001)
D
Prepare the contact surfaces on the braids, and the circuit breaker connec-
tions.
Refer to the procedure “Connections with preparation of electrical contact
surfaces”, see summary for reference (...31--501).
D
Assemble the braids, and tighten to torque.
Refer to the procedure “Bolting and tightening torques”, see summary for ref-
erence (...31--001).
.
A
...31--501
FLEXIBLE CONNECTIONS.
SUPPLY FOLLOWING CUSTOMER
COMMAND(ORDER).
daNm
...31--001
VS...GAD01D
Circuit-breaker
General arrangement
.
A
.
A
VS...GAD01D
Circuit-breaker
General arrangement
SCREWS
SUPPLY FOLLOWING CUSTOMER
COMMAND(ORDER)
Continued on next page.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...