Page 3-20
EASA Approved
Initial issue
3.10
Inadvertent Icing Encounter
a.
CARBUR. PREHEATING
OPEN (pull to open)
b.
Icing area
Leave - turn back or change altitude to obtain an outside air temperature that is
less conducive to icing
c.
CABIN HEATING
OPEN (pull to open)
d.
THROTTLE
Increase engine speed to minimize ice build-up on the propeller blades;
if excessive vibration is noted, immediately reduce engine speed to idle,
and then rapidly apply full throttle
e.
Manifold pressure
indicator
Check - a loss of manifold pressure could be caused by ice blocking the air intake
filter
f.
THROTTLE
As required to hold manifold pressure
g.
Control surfaces
Continue move to maintain their movability
h.
Landing planning
Plan a landing at the nearest airport; with an extremely rapid ice build-up, select
a suitable off airfield landing site
i.
Wing flaps
Leave
FLAPS 0
; with a severe ice build-up on the horizontal tail, the change
in wing wake airflow direction caused by wing flap extension could result
in a loss of elevator effectiveness
j.
Windshield
Open left window and, if practical, scrape ice from a portion of the windshield
for visibility in the landing approach
k.
Approach
Perform approach using a forward slip, if necessary, for improved visibility
l.
Airspeed
130 to 140 IAS / 70 to 76 KIAS depending upon the amount of ice accumulation.
m.
Landing
Perform in level attitude
WARNING
Flights in icing conditions are prohibited!
If icing is formed on the wing leading edge, expect false indication
of the airspeed, altitude, vertical speed and stall warning system!
CAUTION
With an ice accumulation of 6.4 mm / 0.25 inch or more on the
wing leading edges, expect significantly higher power
requirements, higher approach and stall airspeeds, increased
vibration, worse climb characteristics and a longer landing roll.
Missed approaches should be avoided whenever possible!
NOTE
When using the carburetor preheating, engine power will decrease
due to hot air suction from the heat exchanger.
Summary of Contents for WT9 Dynamic LSA / Club
Page 2: ...This page is left blank intentionally...
Page 4: ...Page B Initial issue This page is left blank intentionally...
Page 8: ...Page F Initial issue Chapter Page Date Chapter Page Date...
Page 10: ...Page H Initial issue This page is left blank intentionally...
Page 20: ...Page 1 4 Initial issue Three View Drawing Fig 1 1 Three view drawing...
Page 94: ...Page 4 28 Initial issue This page is left blank intentionally...
Page 109: ...Initial issue EASA Approved Page 5 15 Fig 5 2 Crosswind U S Standard Units...
Page 110: ...Page 5 16 EASA Approved Initial issue This page is left blank intentionally...
Page 119: ...Initial issue EASA Approved Page 6 9 Fig 6 2 Operating Weight CG limit Metric Units...
Page 120: ...Page 6 10 EASA Approved Initial issue Fig 6 3 Operating Weight CG limit U S Standard Units...
Page 134: ...Page 6 24 EASA Approved Initial issue This page is left blank intentionally...
Page 148: ...Page 7 14 Initial issue Fig 7 5 Arrangement screen 1 Fig 7 6 Arrangement screen 2...
Page 149: ...Initial issue Page 7 15 Fig 7 7 Arrangement screen 3 Fig 7 8 Arrangement screen 4...
Page 150: ...Page 7 16 Initial issue Fig 7 9 Arrangement screen 5 Fig 7 10 Arrangement screen 6...
Page 162: ...Page 7 28 Initial issue Fig 7 16 Arrangement screen 1 Fig 7 17 Arrangement screen 2...
Page 163: ...Initial issue Page 7 29 Fig 7 18 Arrangement screen 3 Fig 7 19 Arrangement screen 4...
Page 164: ...Page 7 30 Initial issue Fig 7 20 Arrangement screen 5 Fig 7 21 Arrangement screen 6...
Page 165: ...Initial issue Page 7 31 Fig 7 22 Arrangement screen 7 Fig 7 23 Arrangement screen 8...
Page 178: ...Page 7 44 Initial issue This page is left blank intentionally...
Page 188: ...Page 8 10 Initial issue Fig 8 5 Fuel draining...
Page 198: ...Page 8 20 Initial issue This page is left blank intentionally...
Page 204: ...Page 9 6 Initial issue This page is left blank intentionally...