Initial issue
Page 4-3
4.1
General
This chapter provides checklists and recommended procedures for normal operation of the aircraft. Normal
procedures associated with equipment can be found in the Chapter 9.
The control surfaces do not return to neutral or trimmed position automatically when the control is released.
CAUTION
The ailerons do not return to neutral automatically when the roll
control is released!
CAUTION
The elevator does not return to the precise trimmed position when
the pitch control is released!
The aircraft may not maintain positive longitudinal stability, when
the pitch control is released!
CAUTION
The rudder does not return to neutral automatically when the yaw
control is released!
NOTE
The pitch trim range may be insufficient for the speeds less than
1.5 V
S0
and above V
C
.
4.2
Airspeeds for Normal Operation
Unless stated otherwise, the following speeds are based on maximum takeoff weight 600 kg / 1323 lb.
Takeoff rotation
FLAPS 1
65
–
70 IAS
35
–
38 KIAS
Climb
Normal
122
–
127 IAS
66
–
69 KIAS
Best rate of climb
speed
(at sea level)
127 IAS
69 KIAS
Best angle of climb
speed
(at sea level)
100 IAS
54 KIAS
Landing approach
FLAPS 1, FLAPS 2
120
–
130 IAS
65
–
70 KIAS
Balked landing
Full power (
FLAPS 1
)
110
–
130 IAS
60
–
70 KIAS
Rough air penetration
Maximum
218 IAS
118 KIAS
Demonstrated crosswind velocity
Takeoff
8.3 m/s
16.1 knots
Landing
7.5 m/s
14.6 knots
Summary of Contents for WT9 Dynamic LSA / Club
Page 2: ...This page is left blank intentionally...
Page 4: ...Page B Initial issue This page is left blank intentionally...
Page 8: ...Page F Initial issue Chapter Page Date Chapter Page Date...
Page 10: ...Page H Initial issue This page is left blank intentionally...
Page 20: ...Page 1 4 Initial issue Three View Drawing Fig 1 1 Three view drawing...
Page 94: ...Page 4 28 Initial issue This page is left blank intentionally...
Page 109: ...Initial issue EASA Approved Page 5 15 Fig 5 2 Crosswind U S Standard Units...
Page 110: ...Page 5 16 EASA Approved Initial issue This page is left blank intentionally...
Page 119: ...Initial issue EASA Approved Page 6 9 Fig 6 2 Operating Weight CG limit Metric Units...
Page 120: ...Page 6 10 EASA Approved Initial issue Fig 6 3 Operating Weight CG limit U S Standard Units...
Page 134: ...Page 6 24 EASA Approved Initial issue This page is left blank intentionally...
Page 148: ...Page 7 14 Initial issue Fig 7 5 Arrangement screen 1 Fig 7 6 Arrangement screen 2...
Page 149: ...Initial issue Page 7 15 Fig 7 7 Arrangement screen 3 Fig 7 8 Arrangement screen 4...
Page 150: ...Page 7 16 Initial issue Fig 7 9 Arrangement screen 5 Fig 7 10 Arrangement screen 6...
Page 162: ...Page 7 28 Initial issue Fig 7 16 Arrangement screen 1 Fig 7 17 Arrangement screen 2...
Page 163: ...Initial issue Page 7 29 Fig 7 18 Arrangement screen 3 Fig 7 19 Arrangement screen 4...
Page 164: ...Page 7 30 Initial issue Fig 7 20 Arrangement screen 5 Fig 7 21 Arrangement screen 6...
Page 165: ...Initial issue Page 7 31 Fig 7 22 Arrangement screen 7 Fig 7 23 Arrangement screen 8...
Page 178: ...Page 7 44 Initial issue This page is left blank intentionally...
Page 188: ...Page 8 10 Initial issue Fig 8 5 Fuel draining...
Page 198: ...Page 8 20 Initial issue This page is left blank intentionally...
Page 204: ...Page 9 6 Initial issue This page is left blank intentionally...