background image

O

PTION 

: P/N 038-01500-02 

O

PTION 

I

NSTRUCTIONS

: P/N 063-09035-01

 

 

G

LA

S

TAR 

J

UMP

-S

TART 

F

USELAGE

 

I

NSTRUCTIONS

 

I

NTRODUCTION

 

These instructions apply to the GlaStar Jump-Start Fuselage Option with the bulkheads 

installed.  Unlike most of Stoddard-Hamilton’s option instructions, these are intended 

primarily to tell you what 

not 

to do—or in other words, to outline the 

Assembly Manual 

steps that have already been completed at the factory and to highlight what work 

remains for the homebuilder. 

In addition to these instructions, the Jump-Start Fuselage Option consists of three 

elements: 

1)  

The fuselage assembly itself, which consists of the two fiberglass fuselage shells 

and Top Deck are seamed together and fastened to the steel-tube cage 

structure, with Bulkheads A, B, C, D and E completely fabricated and installed. 

2)  

A COM antenna installation (P/N 211-0112-501).  The copper foil dipole 

antenna elements are factory-bonded inside the vertical fin, and the triaxial 

antenna cable is coiled at the base of the fin for later connection to the radio.  

The remaining components of the installation (a BNC connector, heat shrink 

tubing and instructions) are sealed in a plastic bag taped to the inside of the 

fuselage just forward of the baggage door. 

These instructions follow the sequence of steps of “S

ECTION 

VIII: F

USELAGE 

A

SSEMBLY

” in 

the 

GlaStar Assembly Manual

.   

 

Note Wherever

 the term 

“Manual” 

is used in these instructions, it should be 

taken as referring to the current revision of the 

Manual 

itself along with any 

Advance Notices of Revision that may apply to the steps under discussion.

 

 

 

R

EVISION

D

ATE

1/6/04 

P

AGE

1

 

©2004 New GlaStar, LLC, Arlington, Washington.  All rights reserved.

 

Reviews: