J1 socket can be loaded with 100Ω 23W (0,5A) resistance. Signals in the oscilloscope
can be seen in the following picture.
16.
Please pay attention that voltage spikes should not be happened on the signals. The
peak signal in the channel 1 should not pass 20V, the peak signal in the channel 2
should not pass 600V.
17.
15V supply should be from J4 socket.
18.
0-900VDC supply is increased by 50V. Once it reaches 250VDC, output voltage should
be 27VDC±%2, input should not be passes 200Ua from DC supply and D15 LED
becomes ON. The measuring device on R60 is seen as 12V±%2 or above.
19.
Incoming voltage set to 550V. It is loaded by resistance 24Ω 100W (2A) from J1
socket. The signals can be seen in the following picture. Voltage spikes should be
occurred and output voltage should be observed as 48V±%2 and above.
Summary of Contents for IST5 Series
Page 2: ...2 2 SERVICE MANUAL 10 15 20 30 40 60 80 100 120 160 200 300 KVA...
Page 6: ...9 9 2 PRODUCT DESCRIPTION 2 1 General View 10 15 20 30 40KVA...
Page 7: ...10 10 60 80KVA...
Page 8: ...11 11 100 120 160 200 300 KVA...
Page 13: ...16 16 2 5 Side Interior View 10 15 20 30 40KVA...
Page 16: ...19 19 2 7 Electrical Connections...
Page 35: ...38 38...
Page 36: ...39 39...
Page 51: ...54 54 30 40KVA 60 80 100 120 160 200 300 KVA...
Page 54: ...57 57...
Page 71: ...74 74 1 Turn CB2 ON 10 15 20KVA 30 40KVA...
Page 72: ...75 75 60 80 100 120KVA 2 Stop the UPS using the user front panel Main menu Control Stop...
Page 73: ...76 76 3 Turn CB1 CB3 and CB4 OFF 10 15 20KVA 30 40KVA...
Page 100: ...103 103 Signal Flow Diagram zole trafo means isolated transformer...
Page 102: ...105 105 20 30KVA IGBT Driver 40KVA IGBT Driver...